Friday, December 7, 2007

Fall of 2006

The top photo was taken right after we had used the excavator to stand the front wall of the house. This wall
had 186 individual pieces of 2x6 framing and was 21 feet high. In the center you'll notice the garage, kitchen and
dining room on the right and the master bedroom and bath on the left had allready been completely framed as
we were waiting for the logs to arrive to complete the living room/entry. Lower photo shows 100% exterior frame
with site concrete yet to install.

Posted by Picasa

No comments: